Full Detail Design from cradle to grave

Dockwater Filter Upgrade is DMD’s third project with Cargill, and shows the growth and trust of our working relationship with the client

The project is the introduction of 2 submersible pumps (duty/standby) that pump the Dockwater through two new filters, before entering the system for cooling purposes.

DMD provided the mechanical/piping scope and the structural concept and EC&I layout for this project. 

  • Laser Scanning
  • As-Building
  • Detailed Design
  • Design Co-ordination/BIM Control between Disciplines
  • Fabrication Isometrics
  • Fabrication Support Details
  • Pipe Support Schedule
  • Tie-in Schedule
  • Demolition Package
  • Enabling Package
  • Site TQ Support
  • Successful Fabrication and Installation