

Full Detail Design from cradle to grave
Dockwater Filter Upgrade is DMD’s third project with Cargill, and shows the growth and trust of our working relationship with the client
The project is the introduction of 2 submersible pumps (duty/standby) that pump the Dockwater through two new filters, before entering the system for cooling purposes.
DMD provided the mechanical/piping scope and the structural concept and EC&I layout for this project.