RIBA Stage 3 – Feed Design

Cytiva are repurposing a ‘cash and carry’ warehouse for the new Production Plant in Wales. this will provide Cytiva with 2 new additional belt lines (5 & 6)

DMD provided mechanical/piping design for the project working with BH structural, architectural, and EC&I disciplines to deliver the fast track FEED Study  

  • Laser Scanning
  • Co-ordinated Team Design
  • FEED Design
  • FEED Report
  • General Arrangement Drawings
  • Tie-in Schedule
  • Successfully delivered FEED Study