By-pass

First Floor

Second Floor

Third Floor

Fourth Floor

Full Detail Design

Following IKO ‘as-building’ project IKO are now able to undertake project work that will enhance production and make the site more efficient.

The first of these projects will enable the client to by-pass redundant equipment and streamline production.

DMD Produced all the design data and deliverables for the project.

IKO are reviewing several other option to streamline, This is only possible due to the ‘as-building’ project completed by DMD

  • Laser Scanning
  • As-Building
  • Detailed Design
  • Jacketed Pipework Detailed GA’s
  • Fabrication Support Details
  • Pipe Support Schedule
  • Tie-in Schedule
  • Demolition Package
  • Enabling Package
  • Successfully Delivered Project