- Project Title
- Belt 6 & 7 Membrane Manufacturing Facility – Concept Piping Review
- Project Summary
- The project involved the development of a new membrane manufacturing facility within an existing life-sciences manufacturing site in Cardiff.
- The facility was planned to accommodate two membrane casting production lines, known as Belts 6 and 7, together with associated process equipment, storage vessels, recovery systems and utilities.
- Much of the production equipment had originally been purchased for a separate facility before that project was cancelled and subsequently placed into storage.
- DMD was appointed to undertake an early concept-stage piping review to assess the feasibility of the proposed layouts, identify potential piping routes and highlight key risks requiring consideration during the next design stages.
- Sector
- Life Sciences Manufacturing
- Membrane and Filtration Technology
- Project Location
- Cardiff, Wales
- Client Challenge
- The client needed to integrate two previously purchased membrane manufacturing lines into an existing building originally fitted out for a different manufacturing process.
- The existing facility incorporated ISO 7 cleanroom areas and required significant reconfiguration to accommodate the new process equipment and supporting infrastructure.
- The proposed development included a tank farm, reactor systems, water-treatment equipment, solvent-recovery systems, process utilities and wastewater treatment.
- Early confirmation of viable piping corridors and support arrangements was required to establish whether the concept layout could be developed without significant routing, structural or spatial conflicts.
- The review also needed to identify potential cost and design risks at an early stage, following significant unplanned costs on the previously cancelled project.
- DMD Scope of Work
- Review of the proposed concept layouts
- Identification of potential piping corridors and routing zones
- Cross-checking of proposed routes against the available site point-cloud survey
- Identification of potential primary steel modifications
- Identification of potential secondary steel and pipe-support requirements
- Identification of high-level piping risks and future design considerations
- Preparation of a concept-stage piping review summary
- Engineering Disciplines
- Piping Design
- Structural and Pipe-Support Interfaces
- Project Delivery Approach
- Potential piping corridors and route options were identified throughout the proposed facility.
- The available point-cloud survey was used, where possible, to verify existing conditions and assess spatial constraints.
- Areas likely to require primary or secondary structural steelwork were identified to support future piping installations.
- Key routing, access, constructability and support risks were recorded for consideration during subsequent design stages.
- The review concentrated on establishing the overall feasibility of the concept before progressing into more detailed engineering.
- Findings and recommendations were consolidated into a concise concept-stage summary document.
- Key Engineering Features
- Integration of two membrane casting production lines
- Reuse and relocation of previously purchased process equipment
- Installation within an existing ISO 7 cleanroom facility
- Eight-vessel bulk-storage tank farm
- Two reactor trains comprising three reactors per train
- Reverse-osmosis water systems serving both production lines
- SDA and NMP recovery systems
- Process and building utility distribution
- Provision for a future post-processing facility
- Wastewater balancing and pH-adjustment systems
- Identification of piping corridors within an existing brownfield building
- Early identification of structural and pipe-support requirements
- Key Deliverables
- Proposed piping corridors and routing zones
- Identification of potential primary steelwork requirements
- Identification of secondary steelwork and pipe-support requirements
- Piping risk register and design considerations
- Recommendations for progression into the next design stage
- Concept piping review summary document
- Technology and Software Used
- Autodesk Plant 3D
- Autodesk Navisworks
- 3D laser scanning and point-cloud technology