Case Studies

Dock Water Cooling System Upgrade

Dock Water Cooling System Upgrade

Project Title Dock Water Cooling System Upgrade ($2.8M) Project Summary The project involved the replacement and upgrade of the dock water system used to provide process cooling across the operational plant. The existing centrifugal pump and filtration equipment had...

Dust Filtration Upgrade

Dust Filtration Upgrade

Project Title Dust Filtration Upgrade ($2.3M) Project Summary The project involved the installation of a new bag-filter dust-control system downstream of the existing cyclones. The upgrade was required to reduce particulate emissions and bring the installation within...

Oil System Upgrade

Oil System Upgrade

Project Title Oil System Upgrade ($2.8M) Project Summary The project involved the replacement of an ageing oil stripping and absorption system within an operational production facility. The existing oil stripper, absorber and associated pipework were predominantly...

Discharge Conveyor Replacement

Discharge Conveyor Replacement

Project Title Discharge Conveyor Replacement ($290,000) Project Summary The project involved the replacement of Discharge Conveyor 2, originally installed in 1975. The conveyor was exhibiting advanced internal and external component deterioration and was considered...