Case Studies
Dock Water Cooling System Upgrade
Project Title Dock Water Cooling System Upgrade ($2.8M) Project Summary The project involved the replacement and upgrade of the dock water system used to provide process cooling across the operational plant. The existing centrifugal pump and filtration equipment had...
Dust Filtration Upgrade
Project Title Dust Filtration Upgrade ($2.3M) Project Summary The project involved the installation of a new bag-filter dust-control system downstream of the existing cyclones. The upgrade was required to reduce particulate emissions and bring the installation within...
As-Built P&ID development and 3D Model
Project Title As-Built P&ID development and 3D Model Project Summary The project involved the progressive development of a complete suite of site P&IDs and a coordinated 3D as-built model for an operational manufacturing facility. The work covered the...
Belt 6 & 7 Membrane Manufacturing Facility – Concept Piping Review
Project Title Belt 6 & 7 Membrane Manufacturing Facility – Concept Piping Review Project Summary The project involved the development of a new membrane manufacturing facility within an existing life-sciences manufacturing site in Cardiff. The facility was planned...
Oil System Upgrade
Project Title Oil System Upgrade ($2.8M) Project Summary The project involved the replacement of an ageing oil stripping and absorption system within an operational production facility. The existing oil stripper, absorber and associated pipework were predominantly...
Discharge Conveyor Replacement
Project Title Discharge Conveyor Replacement ($290,000) Project Summary The project involved the replacement of Discharge Conveyor 2, originally installed in 1975. The conveyor was exhibiting advanced internal and external component deterioration and was considered...
Boiler House Distribution Pipework FEED
Project Title Boiler House Distribution Pipework FEED Project Summary The project involved the front-end engineering design of new utility distribution pipework associated with a replacement boiler house at an operational food-manufacturing facility. The distribution...
Carbon Filter Installation and Relief Stack Modification
Project Title Carbon Filter Installation and Relief Stack Modification Project Summary The project involved the design development of a new carbon filtration system to be installed between the existing Cyclone Fan and the associated relief stack to atmosphere. The...