Oil System Upgrade
Project Title Oil System Upgrade ($2.8M) Project Summary The project involved the replacement of an ageing oil stripping and absorption system within an operational production facility. The existing oil stripper, absorber and associated pipework were predominantly...
Boiler House Distribution Pipework FEED
Project Title Boiler House Distribution Pipework FEED Project Summary The project involved the front-end engineering design of new utility distribution pipework associated with a replacement boiler house at an operational food-manufacturing facility. The distribution...
Carbon Filter Installation and Relief Stack Modification
Project Title Carbon Filter Installation and Relief Stack Modification Project Summary The project involved the design development of a new carbon filtration system to be installed between the existing Cyclone Fan and the associated relief stack to atmosphere. The...