by asgmedia | Jul 30, 2026 | Utilities Case Studies
Project Title Dock Water Cooling System Upgrade ($2.8M) Project Summary The project involved the replacement and upgrade of the dock water system used to provide process cooling across the operational plant. The existing centrifugal pump and filtration equipment had...
by asgmedia | Jul 30, 2026 | Utilities Case Studies
Project Title Dust Filtration Upgrade ($2.3M) Project Summary The project involved the installation of a new bag-filter dust-control system downstream of the existing cyclones. The upgrade was required to reduce particulate emissions and bring the installation within...
by asgmedia | Jul 30, 2026 | Powder Coatings Case Studies
Project Title As-Built P&ID development and 3D Model Project Summary The project involved the progressive development of a complete suite of site P&IDs and a coordinated 3D as-built model for an operational manufacturing facility. The work covered the...
by asgmedia | Jul 30, 2026 | Pharmaceutical Case Studies
Project Title Belt 6 & 7 Membrane Manufacturing Facility – Concept Piping Review Project Summary The project involved the development of a new membrane manufacturing facility within an existing life-sciences manufacturing site in Cardiff. The facility was planned...
by asgmedia | Jul 30, 2026 | Food And Beverage Case Studies
Project Title Oil System Upgrade ($2.8M) Project Summary The project involved the replacement of an ageing oil stripping and absorption system within an operational production facility. The existing oil stripper, absorber and associated pipework were predominantly...